 |
|
 |
|
|
 |
(1:14) Liebherr 984c Litronic |

 |
(1:14) Liebherr 984c Litronic |
|
 |
matteoreo
Jungspund

Dabei seit: 03.12.2010
Beiträge: 19
Level: 26 [?]
Erfahrungspunkte: 100.038
Nächster Level: 125.609
 |
|
Good morning to all my name is Matteo from Italy , i want share with you a project started one year ago after seeing a lot of fantastic project in this forum.
This is a reproduction of a Liebherr 984c litronic a friend of mine make the design of the machine that was cut with laser tecnology on metal.
I put some photo of the work done:


The chain came from another project of an italian constructor




this is the traction system after some test i replace the motors and the gear reduction with a strongest type.

this is the traction wheel at the time is not finished i plan to mill the holes for the bolt like the real machine ad make the liebherr logo.




This is one of my favorite image after some test i put the rotation mechanism like the original machine and works very well.


This is the final configuration for the traction at the time i will do any changes i will post that when finished.

This is the upper structure painted green.




First image with part of the hydraulic cylinder




Last week i could test the excavator and work good, at the time i am doing some modification to improve some detail in the machine.
When i do any new photo i will post here.
|
|
06.03.2013 11:00 |
|
|
 |
|
 |
 
 |
|
 |
JensR
Administrator
     
Dabei seit: 16.01.2010
Beiträge: 5.265
Maßstab: 1:14,5 Wohnort: England
Level: 56 [?]
Erfahrungspunkte: 29.413.835
Nächster Level: 30.430.899
 |
|
Welcome here!
What a beast! Love the green
I know everyone is waiting for the video
|
|
06.03.2013 13:18 |
|
|

matteoreo
Jungspund

Dabei seit: 03.12.2010
Beiträge: 19
Level: 26 [?]
Erfahrungspunkte: 100.038
Nächster Level: 125.609
Themenstarter
 |
|
Thanks for your appreciation
this is a small video that i do after that i do some improvement to the radio setup..
|
|
06.03.2013 14:20 |
|
|

jojo1234
Tripel-As


Dabei seit: 24.07.2011
Beiträge: 176
Maßstab: 1:14,5
Level: 36 [?]
Erfahrungspunkte: 885.669
Nächster Level: 1.000.000
 |
|
Wow, looks very nice
Where did you buy the cylinders?
Or did you build them yourself?
__________________ Gruß Jo
|
|
06.03.2013 18:30 |
|
|

matteoreo
Jungspund

Dabei seit: 03.12.2010
Beiträge: 19
Level: 26 [?]
Erfahrungspunkte: 100.038
Nächster Level: 125.609
Themenstarter
 |
|
The cylinder came from the same person that do the chain, when i have the time i put a photo of the kit.
I am planning to put the traction motor and reduction in traction wheel similar to real machine, is a crazy idea but i think that is the right choice.
|
|
07.03.2013 10:06 |
|
|

matteoreo
Jungspund

Dabei seit: 03.12.2010
Beiträge: 19
Level: 26 [?]
Erfahrungspunkte: 100.038
Nächster Level: 125.609
Themenstarter
 |
|
Good morning to all after the arrival of some new parts from the laser cut the work over this machine restart.
I made some ring to protect the rotation gear, also when assembled and painted make the part more realistic..


I also start the modification of the traction system using the gear reduction and the motor directly inside the traction wheel..

this is how it looks now, you can see also the new ring

|
|
30.04.2013 17:23 |
|
|

matteoreo
Jungspund

Dabei seit: 03.12.2010
Beiträge: 19
Level: 26 [?]
Erfahrungspunkte: 100.038
Nächster Level: 125.609
Themenstarter
 |
|
|
06.05.2013 17:15 |
|
|

JensR
Administrator
     
Dabei seit: 16.01.2010
Beiträge: 5.265
Maßstab: 1:14,5 Wohnort: England
Level: 56 [?]
Erfahrungspunkte: 29.413.835
Nächster Level: 30.430.899
 |
|



this one after 3 hours of work

I corrected the links, but the last one is the same as the third one.
|
|
06.05.2013 18:55 |
|
|

jojo1234
Tripel-As


Dabei seit: 24.07.2011
Beiträge: 176
Maßstab: 1:14,5
Level: 36 [?]
Erfahrungspunkte: 885.669
Nächster Level: 1.000.000
 |
|
Wow, it's a very big excavator. The bucket is impressive compared to the trucks.
3 or 4 buckets and the truck is used to drive dumping, isn't it ?
__________________ Gruß Jo
|
|
06.05.2013 22:59 |
|
|

max52
Grünschnabel
Dabei seit: 04.10.2011
Beiträge: 3
Level: 18 [?]
Erfahrungspunkte: 14.881
Nächster Level: 17.484
 |
|
brushless motors that you used
|
|
07.05.2013 07:38 |
|
|

matteoreo
Jungspund

Dabei seit: 03.12.2010
Beiträge: 19
Level: 26 [?]
Erfahrungspunkte: 100.038
Nächster Level: 125.609
Themenstarter
 |
|
Thanks to all, the bucket is 15 cm large and is the largest for the 984c but when the tracks will be complete and working i am planning to do 3 attachment one rock bucket , one 5 tooth ripper and one strange that i see in Germany some year ago.
At this time the rotation use an economic motor that is 890 kv at 3s but i am planning to put instead an axi 680 kv always at 3s because the rotation at this time is to fast for me.
|
|
07.05.2013 14:56 |
|
|
 |
|
 |
 
 |
|
 |
matteoreo
Jungspund

Dabei seit: 03.12.2010
Beiträge: 19
Level: 26 [?]
Erfahrungspunkte: 100.038
Nächster Level: 125.609
Themenstarter
 |
|
Good morning to all after some times i have any news, i continue the work on the drive train i realize the leftover parts to complete the hub..


After some hydraulik test i decide to change the cylinder and start with the bucket first, i friend did a spectacular job and realize an exact copy of the liebherr cilinder...

In this image you can see the difference from another cilinder of a Komatsu pc800..




The inner diameter of the piston is 18mm the external 20 mm.
in the next day i will mount this part over the excavator and perform a test to see hou it works..
|
|
27.05.2013 10:55 |
|
|
 |
|
 |
 
 |
|
 |
matteoreo
Jungspund

Dabei seit: 03.12.2010
Beiträge: 19
Level: 26 [?]
Erfahrungspunkte: 100.038
Nächster Level: 125.609
Themenstarter
 |
|
Yesterday i install the new cylinder over the 984 this image show the new unit fitted and ready to work for me is a real state of the art.....




This is a small video recorded yestarday at 24 bar pressure, after this we also try at 30 bar with no problem...
http://www.youtube.com/watch?feature=pla…d&v=g1XDf4Fyw
|
|
31.05.2013 11:14 |
|
|
 |
|
 |
 
 |
|
 |
matteoreo
Jungspund

Dabei seit: 03.12.2010
Beiträge: 19
Level: 26 [?]
Erfahrungspunkte: 100.038
Nächster Level: 125.609
Themenstarter
 |
|
Hello to all
After some month of use i decided that is arrived the time to do some changes for improve the efficenci and the realism of the machine so i changed the 4 cilinder from hitachi style to liebherr style and i redone all the upperstructure.
This are the cilinder that realize a friend of mine with my specification, the main difference is the diameter of the piston that now is 16 mm

this image show all the cilinder,

this is the new upper structure


the new conterweight thas is detachable from the machine

the cilinder mounted and painted

with the new cilinder i have increased the digging depth

the new oil tank that now is a part of the machine

the idea was to have the possibility of take out all the hydraulic component without disconnect any tube and prevent leaks in the rest of the machine


For addind more realism all panels can be opened to inspect the inside of the machine




Now i have to finish the body work and i am waiting the new valve from Premacon.
|
|
12.11.2013 12:11 |
|
|
 |
|
 |
 
 |
|
 |
JensR
Administrator
     
Dabei seit: 16.01.2010
Beiträge: 5.265
Maßstab: 1:14,5 Wohnort: England
Level: 56 [?]
Erfahrungspunkte: 29.413.835
Nächster Level: 30.430.899
 |
|
What a beast!
Great improvements!
|
|
12.11.2013 16:24 |
|
|
|
|
 |
Views heute: 80.564 | Views gestern: 90.175 | Views gesamt: 292.908.032
Impressum
|
|
 |
|
 |
|